REFERENCE LIST
EGICCO
GOLDEN ARROW
REFERENCE LIST

623
Projects Capacity
12
Projects Size
32
Clients
800
Value $
Project Name | ProjectOwner | |||||||||||||||||
Horizontal Direction Drilling for 57(water and utilities) crossingBelow the Regional Ring Road –New Capital with a diameter of800 mm- 630mm-560mm-160mm-110mm | WaterDepartmentof the ArmedForces | |||||||||||||||||
Horizontal Direction Drilling for 9(water and utilities) crossingBelow the Middle ring road –New Capital with a diameter of355mm-315mm-160mm | WaterDepartmentof the ArmedForces | |||||||||||||||||
Horizontal Direction Drilling forcrossing Below Cairo Alexandriadesert road with a diameter of1200mm | WaterDepartmentof the ArmedForces | |||||||||||||||||
Horizontal Direction Drilling for 44 | South CairoElectricityDistribution | |||||||||||||||||
Horizontal Direction Drilling for 6 | South CairoElectricityDistribution | |||||||||||||||||
Horizontal Direction Drilling for 6 | South CairoElectricityDistribution | |||||||||||||||||
Crossing the horizontal drillingsystem directed for The pipelinecarrying water with a diameter of1200mm Down the Army Road inAl-Awayed Crossing | The ArabContractors(OthmanAhmedOthman &Co.) | |||||||||||||||||
Horizontal Direction Drillingunder the central ring road, theintersection of Helwan Cornice,for a single line, a 16 inch steelpipe with a length of 700 meters. | PetroleumPipelinesCompany | |||||||||||||||||
Crossing the horizontal drillingsystem directed at the MarshalTantawi Bridge in Muqattam, for asingle line of steel, 16 inches, witha length of 1200 meters. | PetroleumPipelinesCompany | |||||||||||||||||
Crossing the horizontal drillingsystem directed down thecrossroads of Town Gas to theMonorail and Queer Al-Wafa andAl-Amal line for the Mostorod /Al-Tebbin line of 912 meters. | PetroleumPipelinesCompany | |||||||||||||||||
Crossing the horizontal drillingsystem directed in betweenairport and military college, for asingle line of steel, 6 inches, witha length of 1200 meters. | Egyptian | |||||||||||||||||
Crossing the horizontal drillingsystem directed Below Al-Waldiyapower station, Assiut with adiameter of 12" inch and of 496meter long | PETROJET | |||||||||||||||||
Crossing the horizontal drilling systemdirected Below the ALWAHAT ROAD atGANET MISR IN 6TH OCTOBER for Thepipeline carrying water with a diameterof 1200 mm with a 220meter long | ALOEGYPT | |||||||||||||||||
Crossing the horizontal drilling systemdirected Below DAHSHOUR link ROADat GANET MISR IN 6TH OCTOBER forThe pipeline carrying water with adiameter of 1200 mm with a 230 meterlong | ALOEGYPT | |||||||||||||||||
Crossing the horizontal drilling systemdirected Below the lake and A-2 ROADat El Alamein for The pipeline carryingwater with a diameter of 710 mm witha 228 meter long | CONCORD | |||||||||||||||||
Crossing the horizontal drilling systemdirected Below the lake and A-3 ROADat El Alamein for The pipeline carryingwater with a diameter of 355 mm+ 110mm with a 251 meter long | CONCORD | |||||||||||||||||
Crossing the horizontal drilling system | CONCORD | |||||||||||||||||
Crossing the horizontal drilling systemdirected Below the lake and A-3 ROADat El Alamein for The pipeline carryingwater with a diameter of 630 mm witha 228 meter long | Al- | |||||||||||||||||
Crossing the horizontal drilling systemdirected for The pipeline carrying waterwith a diameter of 1200mm with a 300meter long from Kafr-Soliman waterstation to the navigation channel at RasEl-Bar | The ArabContractors(OthmanAhmed Othman& Co.) | |||||||||||||||||
Crossing the horizontal drilling systemdirected Below the artificial lake at ElAlamein for The pipeline carrying waterwith a diameter of 280 mm with a 222meter long | The Arab | |||||||||||||||||
Crossing the horizontal drilling systemdirected Below the C4 ROAD at ElAlamein for The pipeline carrying waterwith a diameter of 800 mm with a 220meter long | The Arab | |||||||||||||||||
Crossing the horizontal drilling systemdirected Below the C3 ROAD at ElAlamein for The pipeline carrying waterwith a diameter of 900 mm with a 220meter long | The Arab | |||||||||||||||||
Crossing the horizontal drilling systemdirected Below the lake and C4 ROADat El Alamein for The pipeline carryingwater with a diameter of 900 mm witha 270meter long | The Arab | |||||||||||||||||
Crossing the horizontal drilling systemdirected Below the lake and C4 ROADat El Alamein for The pipeline carryingwater with a diameter of 255 mm witha 216 meter long | The Arab | |||||||||||||||||
Crossing the horizontal drilling systemdirected at ARMENT for The pipelinecarrying water with a diameter of 710mm with a 120 meter long. | The Arab | |||||||||||||||||
Crossing the horizontal drilling systemdirected at ARMENT for The pipelinecarrying water with a diameter of 710mm with a 120 meter long. | The Arab | |||||||||||||||||
Crossing the horizontal drilling systemdirected at ARMENT for The pipelinecarrying water with a diameter of 710mm with a 245 meter long. | The Arab | |||||||||||||||||
Crossing the horizontal drilling systemdirected at ARMENT for The pipelinecarrying water with a diameter of 710mm with a 109 meter long. | The Arab | |||||||||||||||||
Crossing the horizontal drilling systemdirected at ARMENT for The pipelinecarrying water with a diameter of 710mm with a 127 meter long. | The Arab | |||||||||||||||||
Crossing the horizontal drilling systemdirected at AL- NAMASA-1 for Thepipeline carrying water with a diameterof 710 mm with a 118 meter long. | The Arab | |||||||||||||||||
Crossing the horizontal drilling systemdirected at AL- NAMASA-2 for Thepipeline carrying water with a diameterof 710 mm with a 118 meter long. | The Arab | |||||||||||||||||
Crossing the horizontal drilling systemdirected at ASSIUT for The pipelinecarrying water with a diameter of800mm with a 200 meter long | The Arab | |||||||||||||||||
Crossing the horizontal drilling systemdirected at ASSIUT for The pipelinecarrying water with a diameter of800mm with a 120 meter long | The Arab | |||||||||||||||||
Crossing the horizontal drilling systemdirected in ASSIUT for The pipelinecarrying water with a diameter of 800mm with a 210 meter long | The Arab | |||||||||||||||||
Horizontal direction drilling underCornice El Nil road in the Masperoproject for 4 HDPE pipelines, 20 inchesin diameter, 426 meters long. | South CairoElectricityDistribution | |||||||||||||||||
Horizontal direction drilling underCornice El Nil road in the Masperoproject for 4 HDPE pipelines, 20 inchesin diameter, 423 meters long. | South CairoElectricityDistribution | |||||||||||||||||
Horizontal direction drilling underCornice El Nil road in the Masperoproject for 4 HDPE pipelines, 20 inchesin diameter, 444 meters long. | South CairoElectricityDistribution | |||||||||||||||||
Horizontal direction drilling underCornice El Nil road in the Masperoproject for 4 HDPE pipelines, 20 inchesin diameter, 462 meters long. | South CairoElectricityDistribution | |||||||||||||||||
Horizontal direction drilling underCornice El Nil road in the Masperoproject for 4 HDPE pipelines, 20 inchesin diameter, 450 meters long. | South CairoElectricityDistribution | |||||||||||||||||
Horizontal direction drilling underCornice El Nil road in the Masperoproject for 4 HDPE pipelines, 20 inchesin diameter, 480 meters long. | South CairoElectricityDistribution | |||||||||||||||||
Horizontal direction drilling underCornice El Nil road in the Masperoproject for 3 HDPE pipelines, 20 inchesin diameter, 472 meters long. | South CairoElectricityDistribution | |||||||||||||||||
Modifications of medium voltagecables inconsistent with the new Al-Asmarat axis in an area of 70 acres | South CairoElectricityDistribution | |||||||||||||||||
Connecting the Farouk Abdel Moneimline and the Ramzi Omar line andfeeding a new proposed booth in thename of Ezbet Abdel Karim | South CairoElectricityDistribution | |||||||||||||||||
Connecting Al-Nahda 66 KVtransformers, 66 kV. In the Cairoelectricity area, the electrical networkis of the gas-insulated type, GIS | South CairoElectricityDistribution |